the start
7th June 2005
<-- Index | Showing 1-15 of 15 pictures | Index -->
baseboard construction starts.
a long journey starts with a small step
first frame built
first frame built
640x480
ravensclyffe1.jpg
Sheena does some modelling
Sheena does some modelling
640x480
ravensclyffe2.jpg
after cutting the wood we laid it out in the garden
after cutting the wood we laid it out in the garden
2592x1944
boards.JPG
me working flat out after all the sawing
me working flat out after all the sawing
2592x1944
flat_out.JPG
lower fiddle entrance board
lower fiddle entrance board
640x480
Image021.jpg
lower fiddle middle of entrance
lower fiddle middle of entrance
640x480
Image022.jpg
track laying starts
track laying starts
640x480
Image036.jpg
three boards
three boards
640x480
Image037.jpg
it grows
it grows
640x480
Image038.jpg
point templates glued down
point templates glued down
640x480
Image039.jpg
the centre of the layout
the centre of the layout
640x480
Image040.jpg
time for a fast exit? (from the lower fiddle yard)
time for a fast exit? (from the lower fiddle yard)
640x480
Image041.jpg

640x480
corner.jpg
following comment that we need to encourage younger modellers this is the first loco for the NCB section of the layout
following comment that we need to encourage younger modellers this is the first loco for the NCB section of the layout
640x480
omwb_210605.jpg

640x480
woodwork.jpg